Jump to content

First Capital Connect

From Simple English Wikipedia, the free encyclopedia
First Capital Connect
File:377514 at St Pancras International Platform 1.jpg
Overview
Franchise(s)Thameslink Great Northern
1 Apr 2006 – 13 Sep 2014
Main region(s)East of England, London, South East England
Stations called atapprox. 129
Stations operated77
Route km operated778.9
National Rail abbreviationFC
Parent companyFirstGroup
Websitewww.firstcapitalconnect.co.uk
Route map
Route map

First Capital Connect was a train company in England. It ran the Thameslink railway line between Brighton and Bedford and it ran services along the East Coast Main Line from King's Cross and Peterborough, Cambridge, and King's Lynn from 1 April 2006 to 13 September 2014.

It was owned by First Group.

On 14 September 2014, the franchise was taken over by Govia Thameslink Railway, and it became part of the larger Thameslink, Southern and Great Northern franchise.

Rolling stock[change]

First Capital Connect took on a fleet of Class 319 units from Thameslink. It also took on a fleet of Class 313, 317 and 365 units from WAGN on the Great Northern routes.

Class Image Type Top speed Number Routes operated Built
mph km/h
Class 03 File:FCC 03179 at NVR.jpg Diesel Locomotive 28 46 1 Shunting 1957–1961
Class 313 File:Ready to depart, the 12.54 to Moorgate from Hitchin. - panoramio.jpg EMU 75 120 44 Inner suburban Great Northern
(Moorgate - Letchworth Garden City/Hertford North/Welwyn Garden City)
1976–1977
Class 317/1 File:317342 AND 317340 Peterborough.JPG 100 160 12 Fast & Semi Fast Great Northern
London King's Cross to Peterborough & Cambridge
1981–1982
Class 317/7 File:317719 NatEx East Anglia LST.JPG 2 Used to provide cover for Class 365 units undergoing refurbishment.
Withdrawn at end of franchise.
Class 319 File:Blackfriars station MMB 09 319378.jpg 84 Thameslink
(Brighton - Bedford, Sutton - Luton and Kentish Town - Sevenoaks)
1987–1988
1990
Class 321 File:Peterborough railway station MMB 02 321404.jpg 13 Fast & Semi Fast Great Northern
London King's Cross to Peterborough & Cambridge
1989–1990
Class 365 Networker Express File:Class 365 8-car unit at Ely.JPG 40 Fast & Semi Fast Great Northern
London King's Cross to Peterborough & King's Lynn via Cambridge
1994–1995
Class 377/2 Electrostar File:Harrow and Wealdstone station MMB 14 377213.jpg 11 Thameslink
(Brighton - Bedford and peak services: Bedford - Ashford International/Rochester)
Class 377/2s sub-leased from Southern.
2003–2004
Class 377/5 Electrostar File:377519 at Bedford.jpg 23 2008–2009

Depots[change]

First Capital Connect operated two depots:

References[change]

Other websites[change]

File:Commons-logo.svg Media related to Lua error in Module:Commons_link at line 47: attempt to index field 'wikibase' (a nil value). at Wikimedia Commons

  • Lua error in Module:Official_website at line 90: attempt to index field 'wikibase' (a nil value).
Preceded by
Thameslink
Thameslink franchise
Operator of Thameslink and Great Northern franchise
2006 – 2014
Succeeded by
Govia Thameslink Railway
Thameslink, Southern and Great Northern franchise
Preceded by
West Anglia Great Northern
West Anglia Great Northern franchise